Welcome to Pepagora.com, Join FreeSign In

Double Block & Bleed

Two Seal Tite® fittings are welded to the line Temporary valves are installed and two line stop taps completed

  • FOB Price
    NA
  • Min Order Quantity
    NA
  • Payment Terms
    NA
  • Share:
Request for Quote

Other Details

  • Two Seal Tite® fittings are welded to the line
  • Temporary valves are installed and two line stop taps completed
  • The two line stops are set and the pressure is vented downstream of both line stops
  • The primary line stop holds the pressure while the secondary line stop ensures a 100% safe seal
  • The work downstream is completed
  • The line stops are equalized and removed
  • Seal Tite® competition plugs are set and the temporary valves removed

Images

Email to this Supplier